General Contracting

Bogatay Construction is responsible for the day-to-day oversight of the construction site, and management of vendors and trades. In addition, we keep communication between the general contractor and the involved parties open and clear throughout the course of project.
Before starting a job, Bogatay Construction must first assess the project specific documents. In the case of renovations, sometimes a site visit is required to get a better understanding of the project. As a result of this, Bogatay Construction will generate a price, also called an “estimate.” We will then estimate the cost of materials, equipment as well as the cost of labor to provide the owner with an approximate price for the project.
In these contract documents, the contract agreement includes budget, the general and special conditions and the plans and specification of the project that are prepared by a design professional such as an architect. In many instances Bogatay Construction is the project engineer or project manager for construction projects.

CM/GC

Construction Manager/General Contractor (CM/GC) contracting method utilizes an integrated “Team” approach applying modern management techniques to the planning, design, and construction of a project in order to control time and cost, and to assure top quality for the project owner.
The “Team” consists of the Owner, an A&E firm (retained by the Owner), and the CM/GC. The CM/GC method includes both pre-construction and construction phase services. The A&E is selected utilizing the standard consultant selection process.
Bogatay Construction has completed a wide variety CM/GC contracts. Key benfits would include:
Innovative funding scenarios where multiple owners may dictate final project criteria; Complex construction phase where Bogatay Construction’s timely input is invaluable; Projects where limited budgets threaten the delivery of the project, Bogatay Construction’s value engineering and design alternatives can help to contain costs and maxiumize the projects value-to-cost ratio; CM/GC helps achieves a time sensitive schedule.

Design Build

Design-Build relies on a single point of responsibility contract. It is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.Design-Build streamlines project delivery through a single contract between the owner and the Bogatay Construction team. This simple but fundamental difference saves money and time by transforming the relationship between designers and builders into an alliance, which fosters collaboration and teamwork. United from the outset of every project, an integrated team readily incorporates BIM and LEED certification goals.
Here are some advantages with using Bogatay Construction as your Design-Build contractor:Faster Delivery — collaborative project management means work is completed faster with fewer problems; Cost Savings — an integrated team is geared toward efficiency and innovation; Improved Quality — design-builders meet performance needs, not minimum design requirements, often developing innovations to deliver a better project than initially imagined; Singular Responsibility — one entity is held accountable for cost, schedule and performance; Decreased Administrative Burden — owners can focus on the project rather than managing disparate contracts.